BACKGROUND AND DESCRIPTION
The City of Orinda is proposing to repair the culvert crossing of Lavenida Road at Moraga Creek. Refer to attached location map. Currently, the bottom of the 120 inch diameter corrugated metal pipe (CMP) culvert is rusted out and the slopes of the creek are sloughing off into the creek. The City proposes to repair the bottom of the culvert and stabilize the banks. The general land use in the project vicinity is urban with residential properties surrounding the culvert and roadway. The Project is funded and administered by the City. There is no federal funding.
The proposed project will consist of repairing the CMP culvert which is severely rusted to the extent that much of the invert is missing and the pipe is deformed. The Project will also include bank stabilization and creek improvement measures.