Sign up to receive a text message or email when new bids are added!
Bid Title: Lavenida Culvert RFP
Category: Public Works and Engineering
Status: Closed

Description:

BACKGROUND AND DESCRIPTION

The City of Orinda is proposing to repair the culvert crossing of Lavenida Road at Moraga Creek.  Refer to attached location map.   Currently, the bottom of the 120 inch diameter corrugated metal pipe (CMP) culvert is rusted out and the slopes of the creek are sloughing off into the creek.  The City proposes to repair the bottom of the culvert and stabilize the banks.  The general land use in the project vicinity is urban with residential properties surrounding the culvert and roadway.  The Project is funded and administered by the City.  There is no federal funding.

The proposed project will consist of repairing the CMP culvert which is severely rusted to the extent that much of the invert is missing and the pipe is deformed.  The Project will also include bank stabilization and creek improvement measures. 


Publication Date/Time:
5/2/2019 1:45 PM
Closing Date/Time:
Open Until Contracted
Contact Person:
Scott Christie, Sr. Engineer
schristie@cityoforinda.org
City of Orinda
22 Orinda Way
Orinda, CA 94563
Miscellaneous:
TIMELINE/DEADLINES

RFQ Issued and posted (city web site) May 2, 2019
RFI Deadline May 13, 2019
Proposals Due May 23, 2019, 5:00 p.m.
Evaluation of Proposals May 24-27, 2019

Related Documents:

Return To Main Bid Postings Page